This concrete calculator and estimator covers eight shapes — slab, footing, wall, column, circular pad, stairs, curb & gutter, and monolithic slab — with per-field units, a live diagram, bag counts, weight, a cement/sand/aggregate breakdown, and a cost estimate. Bidding a job with several pours? Add each shape to the built-in job total to get one combined cubic-yard and cost figure for the whole project, then copy or print the summary. The guide below explains every formula it uses, so you can check the math by hand.
How to Use This Concrete Estimator
Pick the shape that matches your pour, enter each dimension in whichever unit is easiest — feet, inches, yards, meters, or centimeters — and the calculator converts everything automatically. Adjust the waste allowance slider to match your site conditions, and the ordered volume updates instantly in cubic yards, cubic meters, and cubic feet, along with a bag count, total weight, and material breakdown.
How Concrete Is Measured and Ordered
In the United States, ready-mix concrete is bought and sold by the cubic yard (yd³); most of the rest of the world orders in cubic meters (m³). The single most useful conversion to memorize is that one cubic yard equals 27 cubic feet, because almost every residential dimension starts out in feet and inches. For metric work, one cubic meter is about 1.308 cubic yards, and one cubic yard is about 0.7646 cubic meters.
Small pours are usually handled with bagged concrete instead of a truck. A bag is rated by the volume of wet concrete it yields, not by its dry weight alone — which is why this concrete calculator reports a bag count for the four common sizes: 40, 50, 60, and 80 lb.
The Core Formula and the One Rule That Matters
For any rectangular pour, the volume formula is simply:
Volume = Length × Width × Thickness
The rule that trips people up is unit discipline: every dimension must be converted to the same unit before you multiply. Thickness is the usual culprit, because slabs are quoted in inches while length and width are in feet.
Formulas for Every Shape This Calculator Supports
Real projects are rarely a single flat rectangle. This estimator covers eight shapes, each with its own geometry:
| Shape | Formula | Worked example |
|---|---|---|
| Slab / Patio | Length × Width × Thickness | 10′×10′×4″ = 1.23 yd³ |
| Footing | Length × Width × Depth | 40′×1.5′×1′ = 2.22 yd³ |
| Wall | (Length × Height − Openings) × Thickness | 20′×8′ wall, 8″ thick, less a 3′×7′ door = 3.43 yd³ |
| Column (rectangular) | Width × Depth × Height | 1′×1′×10′ = 0.37 yd³ |
| Circular pad / column | π × radius² × Height (or Thickness) | 12″ dia. × 10′ tall = 0.29 yd³ |
| Stairs | Sum of each step (Width × Tread × Riser, built up) + throat slab | Varies by rise/run |
| Curb & Gutter | (Curb area + Gutter area) × Run length | Matches DOT curb sections |
| Monolithic slab | Slab volume + thickened perimeter edge (edge width × depth × perimeter) | Standard turn-down slab for sheds & garages |
Bags or Ready-Mix? How Many Bags Per Yard
For small jobs, bagged concrete is cheaper and far more convenient than meeting a truck's minimum order. Each bag yields a fixed volume of wet concrete, so the bag count is your total cubic feet divided by the yield per bag:
| Bag size | Yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 ft³ | 90 |
| 50 lb | 0.375 ft³ | 72 |
| 60 lb | 0.45 ft³ | 60 |
| 80 lb | 0.60 ft³ | 45 |
The practical crossover is around one cubic yard. Below that, bags usually win. Above two yards, mixing bags becomes a long day of labor, and a ready-mix truck is both cheaper per yard and stronger, since it's batched consistently and placed before any of it begins to set.
Concrete Mix Ratios
Concrete is cement, sand, and coarse aggregate bound by water. The classic general-purpose ratio is 1:2:3 — one part cement, two parts sand, three parts aggregate — which this calculator's material breakdown expresses as roughly 22% cement, 33% sand, and 45% aggregate by volume. Higher-strength structural work tightens the ratio (e.g. 1:1.5:3), while leaner footings and fill can run 1:3:6.
How Much Does Concrete Weigh?
Standard concrete weighs about 150 lb per cubic foot. Multiply by 27 and a cubic yard weighs roughly 4,050 lb — just over 2 tons. Reinforced concrete runs about 156 lb/ft³, while lightweight structural concrete drops to around 110 lb/ft³. This calculator lets you pick the density so the weight output matches the mix you're placing.
Always Add a Waste Allowance
Never order your exact calculated volume. Subgrades are never perfectly level, forms bow, and some concrete sticks in the chute. Industry practice is 5–10% for clean, well-formed pours on stable ground, rising to 10–15% for rough terrain or irregular shapes.
Order Volume = Calculated Volume × (1 + Waste %)
Estimating Cost and Ordering Smart
Ready-mix is typically priced per cubic yard. Enter a price per yard above and this concrete estimator will show a cost range for your pour. A few ordering habits save real money:
- Know the short-load fee. Most plants charge a premium for orders under a full truck (typically ~10 yd³) and have a minimum delivery, often 1–1.5 yd³.
- Round up, not down. A second partial-load truck costs far more than the modest over-order your waste allowance already covers.
- Schedule for placement, not just delivery. Concrete waits for no one once it's in the chute.
- Confirm the mix design. Tell the plant the strength (e.g. 3,000–4,000 psi for residential flatwork) and any additives.
Choosing the Right Slab Thickness
As a rule of thumb, a 4-inch slab handles patios, walkways, sheds, and most residential floors. Step up to 5–6 inches for driveways and anything carrying vehicles, and reserve 6+ inches, usually reinforced, for heavy vehicles, RV pads, or shop floors. Because volume scales directly with thickness, moving a 400 ft² driveway from 4″ to 6″ raises the pour from about 4.9 yd³ to 7.4 yd³ — a 50% jump.
How Long Does Concrete Take to Cure?
Fresh concrete sets within a few hours and is usually safe to walk on after 24–48 hours. Most slabs accept light vehicle traffic after about 7 days and full loads after 28 days, which is also when design strength (e.g. 3,000 or 4,000 psi) is specified. Keep the surface damp during the first week — concrete cures by hydration, not by drying out.
Quick Reference
- 1 cubic yard = 27 cubic feet ≈ 0.765 cubic meters, and weighs about 4,050 lb.
- A 10′×10′ slab needs about 1.23 yd³ at 4″ thick, or 1.85 yd³ at 6″.
- Bags to fill one yard: 90 (40 lb), 72 (50 lb), 60 (60 lb), or 45 (80 lb).
- A 4′-deep, 12″-diameter post hole holds about 3.14 ft³ — roughly six 80-lb bags.
Explore More Calculators
Frequently Asked Questions
How do I calculate how much concrete I need?
Multiply length × width × thickness (all in the same unit) to get cubic feet, then divide by 27 to get cubic yards. Add a 5–10% waste allowance before ordering.
How many bags of concrete are in a cubic yard?
About 90 bags of 40 lb, 72 bags of 50 lb, 60 bags of 60 lb, or 45 bags of 80 lb concrete fill one cubic yard.
How much does a cubic yard of concrete weigh?
Standard concrete weighs about 150 lb/ft³, so a cubic yard weighs roughly 4,050 lb, or just over 2 tons.
What waste percentage should I add?
Add 5–10% for a clean, well-formed pour on stable ground, and 10–15% for rough terrain or irregular shapes.
Should I order ready-mix or use bags?
Under about one cubic yard, bagged concrete is usually cheaper and more convenient. Above that, a ready-mix truck is typically cheaper per yard and stronger.